Skip to main content

Compute · Cloud · GPU specialist

Crusoe

H100 / H200 / GB200 etc.

GPU typesH100 / H200 / GB200 etc.
BillingHourly / contract
Price basisCapacity is usually contracted per cluster or per GPU-hour. Availability, contract length and egress change the effective price. Verify the official price page (snapshot 2026-11-19).
RegionsUnited States and others; see official availability zones
Storage / egressObject storage and egress by official rates or contract
ComplianceSOC 2 / ISO 27001 and others, per official pages and contract
Minimum spendNo public minimum; whole-machine or contract commitments priced separately
Verified2026-11-19

How to use this provider

Crusoe fits teams that want dedicated GPU capacity without building a full public-cloud account. Compare contract length, capacity guarantee, interconnect and egress before choosing a cluster.

What to check before renting

Start with the job shape: short experiments, steady inference and long training need different billing models. Then calculate the total cost — GPU hours plus storage, egress, cold starts, reruns and staff time. A low GPU-hour rate can lose to a higher rate with better availability and cheaper egress.

Ask for the exact GPU model, whole-machine or per-GPU billing, minimum billing unit, region, interconnect and capacity guarantee. If the workload is sensitive, verify compliance scope for the specific region and service, not the provider's general certificate list.

Sources

Official price page · Documentation · snapshot 2026-11-19.

Price and specification entry points: https://www.crusoe.ai/ · docs: https://docs.crusoecloud.com/ · verified 2026-11-19.